Residential · Oakland, CA · 2025
Boyd Ave, Oakland: two Mitsubishi heat pumps, Zehnder HRV and whole-house dehumidification
A high-performance build in Oakland with the general contractor: two 18,000 BTU Mitsubishi heat pumps paired with a Zehnder heat recovery ventilator with HEPA filtration, an AprilAire whole-house dehumidifier and MERV-16 media filtration, HERS-verified for Title 24.
This Oakland project was built to breathe well, not just stay warm. Working under the general contractor from open framing to finish, we installed two 18,000 BTU Mitsubishi heat pumps for heating and cooling and built the air side around it: a Zehnder ComfoAir Q heat recovery ventilator with a HEPA filter for constant fresh air, an AprilAire whole-house dehumidifier, and MERV-16 media filtration on the return. Ventilation runs were roughed in before the floors and walls closed up, and a HERS rater verified the work for Title 24.
- Type
- High-End Residential Remodel
- Client
- General contractor-led project
- System
- Two 18,000 BTU Mitsubishi heat pumps with a Zehnder ComfoAir Q HRV (HEPA), AprilAire dehumidifier and MERV-16 filtration
- Location
- Oakland, CA · 2025
Scope
- — Two 18,000 BTU Mitsubishi heat pump systems for whole-house heating and cooling
- — Zehnder ComfoAir Q heat recovery ventilator with HEPA filter and prefilter
- — Ventilation distribution and supply plenums roughed in at the subfloor and framing
- — AprilAire whole-house dehumidifier
- — AprilAire MERV-16 media filtration on the main return, plus a MERV-11 filter on a second return
- — Ductwork and registers finished flush into the wood floors
- — HERS verification for Title 24 by a third-party rater
- — Startup and commissioning
Constraints
- — Active construction with the general contractor's schedule and other trades
- — Ventilation runs had to land before subfloor and drywall closed
- — Four separate air-treatment pieces sharing one house
3rdGen's Role
3rdGen was the mechanical subcontractor to the general contractor: heating, cooling, ventilation, dehumidification and filtration from rough-in through startup, plus coordination of the HERS verification.
Outcome
The house heats and cools on two Mitsubishi heat pumps, gets filtered fresh air around the clock through the HRV, and holds humidity in check, with registers finished into the floors.