Accessory dwelling HVAC

HVAC for ADUs & Garage Conversions

Sized for the ADU—Not Tacked Onto the Main House.

An ADU is its own envelope. Tying it onto the existing furnace rarely delivers comfort, code compliance, or a system you can actually service. 3rdGen designs and installs independent HVAC for Bay Area accessory dwellings, garage conversions, JADUs, and small permitted structures.

We plan capacity, equipment that fits tight spaces, outdoor-unit siting, and electrical loads before walls close—so the unit is quiet, permitted, and comfortable on its own.

Project Inquiry

Tell Us About Your ADU

ADU or garage conversion is selected. Share your ZIP, timeline, and how to reach you.

Strategy

The ADU Needs Its Own Mechanical Plan

Garage conversions, backyard cottages, and JADUs do not behave like the main house. The envelope is smaller, the insulation is often new, the mechanical space is tight, and neighbors are closer.

The right time to settle equipment, routing, and electrical is during design and framing—not after the ADU is already drywalled around a leftover mini-split spec.

We size the system to the ADU itself, then coordinate placement and sequencing with your ADU builder, architect, or GC.

What is different about an ADU

What we design around it

  • A separate, smaller envelope

    Independent capacity from a load calculation on the ADU

  • Limited mechanical space

    Compact ducted, ductless, or cassette layouts that fit

  • Garage or backyard siting

    Outdoor-unit location, noise, and neighbor setbacks

  • New electrical service or subpanel

    Heat-pump loads planned with the electrician

  • Tight construction and new insulation

    Ventilation and filtration for a small, sealed space

  • Prefab or builder package specs

    A real mechanical design—not a generic mini-split callout

Systems

Compact Systems That Belong in an ADU

  • 01

    Ductless Heat Pumps

    A strong fit for many garage conversions and compact ADUs. Wall heads or ceiling cassettes give independent comfort without stealing floor or chase space from the main house.

  • 02

    Compact Ducted Systems

    When you want hidden distribution and a quieter interior. We design short duct runs, return paths, and equipment locations that fit a small structure.

  • 03

    Garage Conversions & JADUs

    Existing garages have different insulation, doors, and outdoor-unit options than a new backyard cottage. We design to the converted envelope, not a catalog ADU package.

  • 04

    Electrical, Permits & Title 24

    ADU heat pumps add load. Panel or subpanel work, Title 24, and inspections stay with the same design-build team that sizes the equipment.

Process

Coordinate the ADU While It Is Still Open

  1. 01

    Review the ADU plans and the main house

    We look at the ADU drawings, existing mechanical, electrical capacity, outdoor-unit options, and whether the unit should be fully independent of the main house.

  2. 02

    Size the system to this envelope

    Capacity comes from a load calculation on the ADU—not from extending the main-house furnace or copying a prefab mini-split spec.

  3. 03

    Lock equipment, routing, and electrical

    Indoor unit location, line-sets, condensate, outdoor pad, and panel work get settled before drywall and millwork close the options.

  4. 04

    Install with the ADU schedule

    Rough-in while the structure is open, then trim, startup, and commissioning as the unit approaches occupancy.

Coordination

Small Buildings Still Need Real Coordination

  • Independent zoning

    The ADU should heat and cool on its own schedule. Tying it to the main-house thermostat is usually the wrong comfort and code answer.

  • Outdoor unit siting

    Pads, setbacks, line-hide, and neighbor noise matter more on a backyard or garage site than on a typical house replacement.

  • Routing in tight structure

    Line-sets, condensate, and any ducts have to miss doors, millwork, and low ceilings. We plan that in the drawings.

  • Electrical capacity

    A new ADU heat pump can trigger panel or subpanel work. We flag it early and coordinate with your electrician.

  • Prefab and builder packages

    We can take a generic mechanical spec and turn it into equipment, placement, and permit documentation that actually fits the site.

  • Permits and Title 24

    Load-calc and equipment docs move with the ADU permit path—not as a surprise at inspection.

Best fit

Bring Us In When the ADU Is the Project

This page is for accessory dwellings as the main mechanical job. A whole-home remodel belongs on HVAC for Remodels. A ground-up custom house belongs on HVAC for New Construction.

  • Detached backyard ADUs
  • Garage conversions to living space
  • JADUs and in-law units
  • Prefab or modular ADU packages that need a real mechanical design
  • ADUs that should not hang off the main-house furnace
  • Projects still in design or framing, before walls close

The 3RDGEN difference

Designed Before It’s Installed

A new HVAC system should be based on what your home actually needs, not simply the size of the equipment that happened to be there before.

3RDGEN reviewing MEP plans and tablet drawings on a Bay Area job site
Load calculation and duct layout, on site, before equipment is ordered

Determine what the home needs

We evaluate how your home gains and loses heat so the system matches the house, not a rule of thumb.

Select equipment that matches

We choose heating and cooling equipment that fits those needs without oversizing.

Plan airflow and room comfort

We plan how air moves through the home so rooms feel balanced and comfortable.

04Startup & testing

Install, start up, and test

We install the system, start it up, and verify it is working the way it should before we call the job finished.

You do not need to become an HVAC expert. That is our job. We use the technical work to give you a better finished system.

How We Design Systems

How it goes

A clear path from first question to finished system

One team from the first call to the last: a trained, tested system, not a project that gets handed off three times along the way.

  1. 01 Tell us what you’re planning

    Three questions in the form, or a phone call. You tell us the house and the goal; we tell you whether we are the right shop for it.

    ~40 seconds

  2. 02 We review the home and project

    A site visit with the person who will design the system: ducts, panel, equipment locations, and the rooms that never feel right.

    60-90 min

  3. 03 Receive a recommendation and proposal

    A written scope: equipment, capacity, distribution, electrical work, and what is included, in plain language you can compare against other bids.

    Within 5 days

  4. 04 Permitting and installation

    We handle permits, Title 24, and inspections, and coordinate with your electrician so no one is waiting on anyone.

    2-5 days on site

  5. 05 Startup and final testing

    We start the system, verify airflow and performance, register the warranty, and walk you through operating it.

    Same week

FAQ

Common Questions

Common questions on ADU, JADU, and garage-conversion HVAC.

Can my existing furnace handle the ADU?

Usually not — and even when the numbers can be forced, it rarely delivers good comfort or a system you can service independently. We design a right-sized system for the ADU itself.

Do you work on prefab ADU packages?

Yes. We take generic mini-split callouts and turn them into equipment, placement, electrical coordination, and permit documentation that fits the actual site.

What about noise for adjacent neighbors?

Equipment placement, line-set routing, and product selection all affect noise. We plan the outdoor unit and indoor distribution with ADU siting, setbacks, and neighbors in mind.

Is this the same as HVAC for new construction?

No. New Construction is for ground-up custom homes. This page is for accessory dwellings, garage conversions, and JADUs — smaller envelopes, tighter space, and usually an independent system from the main house.

What if the ADU is part of a larger remodel?

If the driver is a whole-home renovation and the ADU is one piece of that job, start on HVAC for Remodels. If the ADU is the project, stay here.

Ducted or ductless for an ADU?

It depends on the structure. Many garage conversions and compact ADUs fit ductless well. Compact ducted layouts work when you want hidden distribution and have the chase space. We recommend from the envelope, not from a package default.

Who handles permits and Title 24?

We do, as part of the mechanical scope. Permits, Title 24, and inspections are coordinated with the ADU schedule — not left as a surprise at the end.

Do you service what you install?

Startup, handoff, and warranty support on what we design and install, yes. We are not a repair or emergency dispatch company for unrelated breakdowns.

Can a heat pump replace my furnace?

In most homes, yes. Whether your home has existing ducts or not, we’ll help determine the right approach.

Do I need to know whether I want ducted or ductless?

No. We evaluate the home and recommend the approach. You do not need to become an HVAC expert. That is our job.

What happens after I submit the project form?

We review the home and the project, then send a recommendation with scope and pricing: what we recommend, why, and what it includes.

How long does a typical installation take?

Most straightforward replacements take a few days on site. Remodels, ductwork changes, and new construction follow the project schedule. We confirm timing once we review the home and scope.

Still have a question?

Tell us about your ADU

Discuss Your ADU HVAC

Project Inquiry

Tell Us About Your ADU

Share the project, ZIP, timeline, and how to reach you. We will follow up.

Project category
Project type
Timeline