Commercial · Millbrae, CA · 2023
El Camino Real, Millbrae: 8-ton rooftop package unit replacement on a curb adapter
A worn rooftop package unit on a commercial building on El Camino Real, replaced with a new 8-ton, 3-phase gas/electric unit on a curb adapter so it sits on the existing roof curb.
The rooftop package unit serving this commercial space on El Camino Real in Millbrae was at the end of its life. We replaced it with a new 8-ton, 3-phase gas/electric package unit on a sheet-metal curb adapter, so the new unit sits on the existing roof curb without reframing the roof opening. Gas, 3-phase power and condensate were reconnected, and the unit was started up and checked.
- Type
- Rooftop Unit Replacement
- Client
- Owner / developer-led project
- System
- 8-ton, 3-phase gas/electric rooftop package unit on a curb adapter
- Location
- Millbrae, CA · 2023
Scope
- — Disconnected and removed the existing rooftop package unit
- — New 8-ton, 3-phase gas/electric rooftop package unit
- — Sheet-metal curb adapter to fit the new unit to the existing roof curb
- — Gas reconnected with a shutoff valve and flex connector
- — 3-phase power reconnected through the unit disconnect
- — Condensate drain with trap
- — Startup and operating check
Constraints
- — Occupied commercial building on a busy stretch of El Camino Real
- — Existing roof curb sized for the old unit
3rdGen's Role
3rdGen handled the replacement for the building owner: equipment selection, removal of the old unit, installation, reconnection and startup.
Outcome
The space runs on a new rooftop unit sitting on the original curb, with no roof reframing.