Commercial · Berkeley, CA · 2026
Religious Institution Mechanical Upgrade | Berkeley
GC-led mechanical upgrade for a Berkeley religious institution: a Samsung VRF heat pump system, engineered exhaust and ventilation, fire dampers and new air outlets, built to engineer-approved submittals.
3rdGen installed the mechanical upgrade for a religious institution in Berkeley, working for VRGC Inc. with the project architect and mechanical engineer. The building now heats and cools on an all-electric Samsung VRF heat pump system with four-way ceiling cassettes and wall units, plus a separate single-zone unit for the server room. The engineer's design also called for new ventilation: Cook exhaust ventilators, Panasonic and Broan fans, a gravity ventilator, new louvers and fire dampers. The plans went through several revisions, so we re-ran submittals and equipment orders as they changed and installed from the engineer-approved set. Field work ran from March to July 2026.
- Type
- Institutional Upgrade
- Client
- VRGC Inc.
- System
- Samsung VRF heat pump + engineered ventilation
- Location
- Berkeley, CA · 2026
Scope
- — Samsung VRF heat pump system with four-way ceiling cassettes and wall-mounted indoor units
- — Separate Samsung single-zone system for the server room
- — Additional Samsung heat pump split system added when the plans were revised
- — Cook exhaust ventilators, Panasonic and Broan fans, and a gravity ventilator
- — Four new louvers, one with a backdraft damper
- — Two Pottorff fire dampers, including one at an existing louver
- — New supply grilles, ceiling diffusers and return grilles, selected with the architect
- — Refrigerant piping, condensate and controls
- — Change order: second-floor ventilation ducting rerouted
- — Submittals to the mechanical engineer for approval, startup and closeout
Constraints
- — Existing institutional building that stayed in community use
- — Several plan revisions during procurement, each needing updated submittals and orders
- — Equipment and air outlets released only after engineer approval
- — Second-floor ventilation ducting rerouted around existing conditions
- — Coordination with the GC, the architect and the engineer
3rdGen's Role
3rdGen built the mechanical scope from the engineer's plans: we handled submittals and approvals, ordered the Samsung VRF and ventilation equipment through the distributor, took off and released every grille, damper and louver, and installed and started up the system. We worked for VRGC Inc. and coordinated plan changes with the architect and engineer.
Outcome
The building has all-electric Samsung VRF heating and cooling, a dedicated unit for the server room and the engineered exhaust and ventilation the design required, all installed to the approved submittals.