Commercial · Berkeley, CA · 2022
San Pablo Ave Retail TI — Berkeley
GC-led Berkeley retail TI: a Fujitsu two-zone ductless heat pump, makeup air, exhaust and fresh-air ventilation, installed in an active commercial space and passed City of Berkeley inspection.
3rdGen worked for VRGC Inc. on a retail tenant improvement on San Pablo Avenue in Berkeley. The scope paired an all-electric Fujitsu two-zone ductless heat pump (one outdoor unit and two 12,000 BTU indoor units) with the ventilation the TI needed to pass code: a makeup air supply fan, an exhaust fan and new louvers. The space stayed in use during the work, so crews worked from scaffolding around tenant hours, set the outdoor unit in the garage and ran refrigerant and condensate lines through concrete.
- Type
- Commercial Tenant Improvement
- Client
- VRGC Inc.
- System
- Fujitsu 2-Zone Ductless Heat Pump + Ventilation
- Location
- Berkeley, CA · 2022
Scope
- — Fujitsu two-zone ductless heat pump: one outdoor unit, two 12,000 BTU indoor units
- — Outdoor unit set in the garage area
- — Refrigerant line and condensate routing through concrete
- — Makeup air supply fan for code-required fresh air
- — Exhaust fan installation
- — Exterior louvers for makeup air and exhaust
- — Scaffold-supported install at ceiling height
- — City of Berkeley mechanical permit and inspections
Constraints
- — Retail space stayed in use during the work
- — High ceilings: install from scaffolding
- — Concrete walls and slab for line and condensate routes
- — Outdoor unit had to fit in the garage area
- — Makeup air and exhaust had to balance for code ventilation
- — Louver openings coordinated with the GC and building exterior
- — TI schedule set by the GC
3rdGen's Role
3rdGen installed the full mechanical scope to plan for VRGC Inc.: the Fujitsu heat pump system, the makeup air and exhaust fans, louvers, refrigerant and condensate routing, and startup. We pulled the City of Berkeley mechanical permit, met the inspector and coordinated access, scaffolding and louver openings with the GC around tenant hours.
Outcome
The heating, cooling and ventilation scope passed City of Berkeley inspection. The tenant got two zones of all-electric heating and cooling with no gas equipment, and the makeup air and exhaust fans give the space the fresh air the TI required.